On Air Now

Listen

Listen Live Now » 93.7 FM Fargo-Moorhead

Weather

Current Conditions(Fargo,ND 58103)

More Weather »
53° Feels Like: 53°
Wind: WSW 0 mph Past 24 hrs - Precip: 0”
Current Radar for Zip

Today

PM Thunderstorms 75°

Tonight

Partly Cloudy 51°

Tomorrow

Partly Cloudy 78°

Alerts

1st Avenue Bridge repairs set for summer

by
Expansion joint
Expansion joint

FARGO (KFGO AM) A major bridge route connecting Fargo and Moorhead is set for repairs this summer.

Fargo Engineer Kristy Schmidt says the expansion joints need repair and replacement. The work will take about a month. That will require traffic detours.

Schmidt says the repairs, the result of normal wear, were determined after recent inspections of three Red River bridges. The $216,000 project cost will be split evenly between Fargo and Moorhead.

Comments